Option A — Lateral fixing to structural walls
Rigid connections tie the stringers back to the reinforced-concrete walls, cutting the cantilever span and restraining torsion. Concealed behind cladding to suit the architecture.
CAworks · Structural & Architectural Staircases
A helical steel staircase, fabricated and erected by another contractor, could only stand because it was propped on temporary works. Under a single person walking, it visibly moved. CAworks was engaged to take ownership of an unfinished, unstable structure and deliver it safe, code-compliant and beautiful. This is how.
The brief
The staircase at the heart of this residence was built and installed before CAworks was involved. When our engineer first walked the site, the helix stood only because scaffolding and auxiliary props were carrying its load and restraining it from twisting.
Under controlled walking tests the structure showed global vibration, perceptible torsional flex and audible joint movement. There was no central column and no clear, continuous load path; the segmented stringers had been welded together on site with no weld procedures, no inspection records and no verification of the anchors fixing it to the slabs.
Our remit was unambiguous: assess it honestly, then engineer, document and rebuild it into a permanent staircase that is structurally sound, fully compliant with the Dubai Building Code, and worthy of the architecture around it.
As-found risk rating: HIGH
How we work
A single accountable team carried the project through five phases — diagnosing the problem, engineering and proving the fix, securing authority approval, then fabricating and finishing to a luxury standard.
Site inspection, professional structural opinion and conceptual reinforcement options.
3D laser survey, remediation design, a verified 3D model and full FEA calculations.
Dubai Building Code assessment and the submission pack for the design NOC.
Shop drawings, workshop steel fabrication, oak treads and curved toughened glass.
Erection, balustrade and handrails, cladding and final paint finish.
Every rescue starts with a non-intrusive inspection. We record the as-found geometry and behaviour, walk the structure under load, and listen — joint noise and movement tell you as much as deflection does.
Critically, we do not remove the temporary supports. At this stage the props are the only thing preventing torsional rotation and overload of the anchors, so they stay in place until an engineered solution is designed and built.
Before proposing any fix, CAworks issued a formal Professional Opinion — Condition Assessment & Structural Adequacy Review, prepared by a chartered engineer. It documents what was observed, classifies the risk, and sets out conceptual reinforcement strategies — without yet committing to a design.
The conclusion was direct: in its as-found configuration the staircase was structurally unstable without its temporary supports, with a real risk of progressive connection failure if they were removed. The full document is reproduced below with client details removed.
Rather than jump to one answer, we set out the realistic reinforcement strategies, each with its structural logic and its impact on the architecture — so the design conversation could be had on engineering terms.
Rigid connections tie the stringers back to the reinforced-concrete walls, cutting the cantilever span and restraining torsion. Concealed behind cladding to suit the architecture.
One or more steel columns carry vertical load directly to the slab, all but eliminating cantilever action and global deflection. Clad or decorated to match the design intent.
Steel tension rods hung from a new structural beam transfer vertical and torsional load upward. Effective, but dependent on new primary steel overhead.
Shifting the helix to bear against a structural wall gives a direct, redundant load path without visible lateral ties — at the cost of moving the architectural set-out.
Welded triangular stiffeners under each tread and a second outer stringer raise local rigidity. A complementary measure, recommended alongside one of the primary schemes.
The direction taken. The remediation combined a central structural mast (Ø610 × 14.3 mm CHS) with radial support arms and welded brackets — an Option B-style spine that gives the helix a clear vertical load path — reinforced by tread-level stiffening and an outer stringer anchored back to the wall. It removes the torsional instability at its root while staying invisible behind the finished treads and glass.
A single scope took the staircase from survey to a finished, certified installation — engineering, reinforcement, and the full architectural finish.
| Work package | Description | Qty |
|---|---|---|
| Survey & design Design |
| 1 |
| Project management Labour |
Specification, design & fabrication management, production and installation supervision. | 1 |
| Staircase reinforcement Metalwork |
On-site and workshop steelwork to reinforce the existing structure and limit deflection — the central mast, brackets and stiffening. | 1 |
| Hardwood oak step cladding Timber |
| ~79 steps |
| Curved glass balustrade Glass |
| ~62 LM |
| Finishing Paint |
Polishing, priming and painting the steelwork to a selected RAL colour. | 3 flights |
| Stringer cladding Detail |
Cladding the stringers to conceal connections for a seamless finished line. | 3 flights |
Commercial figures are intentionally omitted from this case study.
A hand-built, segmented, site-welded staircase never matches its original drawings. Segments drift during erection, welds pull the geometry, and the surrounding slabs and walls are rarely exactly where the architect's model says. To engineer a fix that actually fits, we first capture the structure as it truly is.
A 3D laser scanner (LiDAR) sweeps the space, firing hundreds of thousands of pulses per second and timing each reflection to fix a point in space. The result is a dense point cloud — millions of measured points — that we register into a single survey-accurate model. Photogrammetry adds true-colour texture where it helps.
That captured geometry becomes the master reference for the reinforcement design, the FEA model, and the millimetre-accurate detailing of the oak treads and curved glass — eliminating guesswork and avoiding expensive re-work on site.
From the survey we rebuild a precise 3D model of the remediated staircase — the central mast, radial arms, helical stringers, treads and balustrade line. Drag to orbit, scroll to zoom.
The interactive 3D model didn't load — this can happen on a slow or restricted connection.
The remediated design was verified in SOLIDWORKS Simulation against the Dubai Building Code, ASCE 7-16 and Eurocode 1 — five static studies plus a modal analysis, on grade S275JR steel. The full-assembly model identifies the worst-loaded flight; every result is checked against code allowables.
| Study | Load case | Peak stress | Deflection | Min. FoS |
|---|---|---|---|---|
| Static 1 | Dead load — full assembly | 43.0 MPa (16% of yield) | 0.94 mm | 6.39 |
| Static 2 | 3.0 kN/m² live — governing | 122.3 MPa (44% of yield) | 1.82 mm | 2.25 |
| Static 3 | 3 kN point load — position 1 | 67.2 MPa | 0.64 mm | 4.09 |
| Static 4 | 3 kN point load — position 2 | 68.7 MPa | 0.83 mm | 4.00 |
| Static 5 | 3 kN point load — position 3 | 53.8 MPa | 0.56 mm | 5.11 |
| Modal | 1st natural frequency | no footfall resonance | 10.08 Hz | |
Every check passes with margin. The lowest factor of safety — 2.25 at a single welded bracket on the middle flight — sits above the residential threshold of 2.0, and the first natural frequency of 10.08 Hz is comfortably clear of the footfall range, so the finished stair feels firm underfoot rather than springy.
A staircase passes authority review only if it is assessed clause-by-clause against the right code. Below is the actual reasoning CAworks set out against the Dubai Building Code 2021, Part K (Villas) — shown next to the real regulation pages it relies on.
1 · Classify the stair correctly. This is a helical / curved stair, assessed under clause K.5.5.2.8 (spiral & curved stairs and winders). Because its tread band sits well away from the centre, we tested it against both the spiral and the curved thresholds — and it satisfies both, so the classification debate never changes the outcome.
2 · Confirm it is even permitted. K.5.5.2.1 expressly allows spiral, winder and open stairs in villas for everything except basement egress. This stair serves no basement, so no fire-rated enclosure is imposed by Part K.
3 · Separate requirements from recommendations. Intermediate landings (K.5.5.2.4) are a recommendation for villa flights over 4 m — not a requirement; the 3,660 mm between-landings limit belongs to Part B / the Fire & Life Safety Code and does not apply to villa stairs; the "spiral not recommended as a main stair" line is advisory, not a prohibition. Knowing which is which is what keeps a submission moving.
4 · Report the one genuine conflict honestly. Clause h) wants the outer handrail on the descending user's right; this helix turns the other way, placing the outer edge on the left. Handing is fixed by the direction of the spiral — it can only be "corrected" by mirroring the whole stair, which the architecture won't allow. So we record it as non-compliant as designed and propose a documented mitigation rather than hiding it.
The assessment reproduces every clause it relies on. These are the actual Dubai Building Code pages behind the matrix above.
Issued for the project's Consultant of Record to counter-sign and submit — a clause-by-clause matrix, the recommendation-vs-requirement reasoning, and the handing mitigation, all in one document.
In Dubai, structural and life-safety documentation for a villa staircase is submitted through the project's Consultant of Record for authority review and a design No-Objection Certificate (NOC) before fabrication is released — and a completion certificate is needed at the end. Getting it wrong, or letting it slip, has real consequences.
If the design is rejected or queried, fabrication is held. A structure already on site stays propped, unusable and exposed — exactly the position this project started from.
Without compliant, signed-off staircase documentation, the villa's completion and handover can be blocked — delaying occupancy and final payments across the whole project.
Unpermitted or non-compliant structural work exposes owner and contractors to municipal penalties, invalidated insurance, and direct liability should the stair ever fail in use.
A stair built ahead of approval may have to be modified — or removed — to satisfy the code: far costlier than engineering and evidencing it correctly the first time.
Every week an NOC is delayed pushes the entire fit-out programme, with knock-on standby and re-mobilisation costs across every trade on site.
We issue the compliance assessment, calculations, GA drawings and glass specification as one coordinated pack — pre-empting the reviewer's questions on landings, classification and handing so the NOC is secured first time.
The engineering resolves into a complete general-arrangement and detail set — plan, elevations, sections A–H, every connection detail, and a 3D isometric set — issued together with the calculations, compliance assessment and glass specification.
The remediation steel — the central Ø610 mast, its radial arms and the load-transfer brackets — is fabricated and welded under controlled workshop conditions, a world away from the unverified site welds of the original. Heavy plate is rolled and cut to the helix, segments are trial-assembled, and every bracket is made to carry its tread's load cleanly into the central spine.
This is where decades of curved-staircase fabrication experience matters: getting a multi-segment helix to come together true, with welds that will pass inspection and perform under torsion and fatigue for the life of the building.
The fabricated assembly is installed against its new central mast and the upper and lower slab landings, with the outer stringer anchored back to the structural wall. Only once the engineered structure is carrying load can the original temporary props finally come out — this time with a verified, continuous load path beneath every step.
Each step is clad in solid French oak, top- and bottom-shaped to follow the curve of the helix, finished at ~30 mm and stained or varnished to the client's selection. Treads are machined to the surveyed geometry so they seat precisely on the steel below, with consistent nosings around the full sweep of the stair.
Illustrative of the curved-glass toughening and lamination process.
The balustrade is 17.5 mm curved laminated toughened glass — among the most demanding products in architectural glass. It is made in four stages:
The curved glass is set into bespoke slotted brackets along the inner line, with continuous handrails to both sides — satisfying the compliance mitigation as well as the architecture. The stringers are clad to conceal every connection, and the steel is primed and painted to a selected RAL.
What began as an unfinished structure standing on scaffolding leaves site as a structurally verified, code-assessed and beautifully finished staircase — delivered by one accountable team.
A representative selection of CAworks helical and curved staircase work — from bare structural steel in the workshop to finished oak and curved-glass installations. These are separate projects shown to illustrate capability, not all the staircase in this case study.
CAworks · Designer Glass & Structural Staircases
One team accountable for the structure and the finish — from a propped, unsafe staircase to a certified, beautiful one.